Friday, June 19, 2015

United States District Court, Houston Division, Pro Se Plaintiff "Louis Charles Hamilton II" Civil Complaint for Defendants, "Raeis Construction Services Ltd. Co.," and "Porter International Construction, L.L.C. CEO Vernon Smith" et al


In The United States District Court

For The Southern District of Texas

Houston Division

Louis Charles Hamilton II

         Pro Se Plaintiff

            Vs.     

Raeis Construction Services Ltd. Co.

David Randin

 5747 Avonley Creek Dr. Sugar Hill, GA 30518

2000 Dairy Ashford, Houston TX. 77007

(Defendant)

            Vs.

Porter International Construction, L.L.C.

Vernon Smith CEO

20165 Old Houston Rd. Porter, Texas, 77365

(Co-Defendants)

            Vs.

Russell Mills

9535 Tower Street Houston Texas, 77088

  All American Concrete and Construction


                                                            Civil Complaint

                                                               Jury Demand

            Comes Now The Pro Se Plaintiff “Louis Charles Hamilton II” herein files “Civil Complaint” with the above Honorable U.S. District Court and for Just Cause, Pro Se Plaintiff herein will show before the “Honorable U.S. District Court” all facts, circumstances, detailing “among other things” Civil Cause of Actions

Specifically, Porter International Construction, L.L.C. CEO “Vernon Smith” committed as follows:

                                                            (1)

Tortious Interference with existing contract between Mr. Louis Charles Hamilton II, and Raeis Construction Services Ltd. Co., over a signed $120,000.00 agreed contract dated April 23rd 2015 to preformed concrete work at 797 Honea Egypt Road, Magnolia, TX

                                                      (2)

Tortious Interference with prospective relations, over a signed $120,000.00 agreed contract dated April 23rd 2015 to preformed concrete work at 797 Honea Egypt Road, Magnolia, TX

                                                            (3)

Civil Conspirers with acting agent David Randin of Raeis Construction Services Ltd. Co. and Russell Mills of “All American Concrete and Construction”

Whom was in partnership with (Pro Se Plaintiff) in this agreed contract dated April 23rd 2015 to preformed concrete work at 797 Honea Egypt Road, Magnolia, TX in excess of said $120,000.00 agreed contract.

To now “Russell Mills” herein having “Vernon Smith” (CEO) of “Porter International Construction, L.L.C” 20165 Old Houston Rd. Porter, Texas, 77365 to performed the said same $120,000.00 agreed contract dated April 23rd 2015 of the Pro Se Plaintiff “Louis Charles Hamilton II”

 Namely to preformed concrete work at 797 Honea Egypt Road, Magnolia, TX with pictures on file of “Porter International Construction, L.L.C” physically performing said same $120,000.00 agreed contract dated April 23rd 2015 o0f the Pro Se Plaintiff

                                                            (4)

Specifically, Porter International Construction, L.L.C. CEO “Vernon Smith” engaged with acting agent David Randin of Raeis Construction Services Ltd. Co. to a hostile Defamation of “Louis Charles Hamilton II” Specifically, “Vernon Smith” of “Porter International Construction, L.L.C” stating of “Louis Charles Hamilton II” concrete skills and abilities being substandard as a concrete contractor to preformed

Any building phase at all in concrete construction, at 797 Honea Egypt Road, Magnolia, TX and further Defame the Plaintiff  as “Worthless, uneducated, unskilled Construction worker trash”…

Specifically, Porter International Construction, L.L.C. CEO “Vernon Smith” never even met Pro Se Plaintiff “Louis Charles Hamilton II”, herein in his person or work with or for past or present with Pro Se Plaintiff during the time frame of said $120,000.00 agreed contract between Pro Se Plaintiff and for Raeis Construction Services Ltd. Co. “David Randin” dated April 23rd 2015 was introduced and signed

                                                            (5)

  Specifically, Porter International Construction, L.L.C. CEO “Vernon Smith” simply hostile, greedy, corrupted in fashion commence to defame, derail, 100% Interference with prospective relations, between the Pro Se Plaintiff and Raeis Construction Services Ltd. Co.

 Specifically, there after all was done as described above Porter International Construction, L.L.C. CEO “Vernon Smith” obtain physically the same said $120,000.00 Concrete Contract to preformed concrete construction, at 797 Honea Egypt Road, Magnolia, TX for Raeis Construction Services Ltd. Co. “David Randin” 5747 Avonley Creek Dr. Sugar Hill, GA 30518

With Raeis Construction Services Ltd.  Having office at 2000 Dairy Ashford, Houston TX. 77007

                                                            (6)

And this simply hostile, greedy, croupted in fashion commence to defame, derail, 100% Interference with prospective relations, between the Pro Se Plaintiff and Raeis Construction Services Ltd. Co. was done after Specifically, by Porter International Construction, L.L.C. CEO

 “Vernon Smith” was physically on said property @797 Honea Egypt Road, Magnolia, TX on April 23rd 2015 while “Louis Charles Hamilton II” already having a business meeting with Raeis Construction Services Ltd. Co. “David Randin” and already secured said $120,000.00 agreed contract dated April 23rd 2015,

                                                            (7)

“However” the Pro Se Plaintiff will show the Honorable Court facts that agent David Randin and  Raeis Construction Services Ltd. Co. and Russell Mills 9535 Tower Street Houston Texas of “All American Concrete and Construction”

Civilly conspire together against the (Plaintiff) with Porter International Construction, L.L.C. CEO “Vernon Smith” in which Porter International Construction, L.L.C. CEO “Vernon Smith” now having possession, custody, and control over the same said $120,000.00 concrete construction contract to performed work at the same job location of 797 Honea Egypt Road, Magnolia, TX and physically did so while

 “Louis Charles Hamilton II” (Pro Se Plaintiff) herein already having a secured concrete contract, blueprints for said $120,000.00 agreed contract signed by “Louis Charles Hamilton II, “David Randi” of “Raeis Construction Services Ltd. Co.” and Russell Mills 9535 Tower Street Houston Texas of “All American Concrete and Construction” dated April 23rd 2015, to performed said agreed Concrete construction at 797 Honea Egypt Road, Magnolia, TX

                                                                        (8)

Specifically, Pro Se Plaintiff will show the Honorable U.S. District Court, fact and circumstances that Porter International Construction, L.L.C. CEO “Vernon Smith” and “Russell Mills” of “All American Concrete and Construction”

Having engage in being partners on many Concrete Construction project over a 25 years past history, with one concrete partnership project done together between “Vernon Smith” and Russell Mills completed recent in 2015 long before Pro Se Plaintiff “Louis Charles Hamilton II” and “Russell Mills” of “All American Concrete and Construction” enter into partnership for contract with “Raeis Construction Services Ltd. Co.”

                                                            (8)

 To include but not limited to  (Hamilton) and (Mills) having a secured concrete contract, blueprints for said $120,000.00 agreed contract signed by “Louis Charles Hamilton II, “David Randi” of “Raeis Construction Services Ltd. Co.” And Russell Mills 9535 Tower Street Houston Texas of “All American Concrete and Construction” dated April 23rd 2015,

To the extent of several additional counts of “Civil Fraud”, with “Breach of Construction Contract”, “Detrimental Reliance”

Among other cause of actions being filed and levy well within the statute of limitation deadline” with the above Honorable U.S. District Court and for Just Cause,

With Principal place of business located for (Defendant) Raeis Construction Services Ltd. Co.  At 5747 Avonley Creek Dr. Sugar Hill, GA 30518 located well in a “Diversity of Jurisdiction” before the Honorable Justice.

                                                            (9)

                   Parties.

Pro Se Plaintiff, Louis Charles Hamilton II, and African American Male, U.S. Navy Veteran, Permanently Disable Veteran protected under: (ADA) American with Disability Act;

 And also minorities persons cover under Title VII of the Civil Rights Act of 1964; Domiciliary State of Texas, P.O. Box 17524 Sugar Land, Texas 77496

                                                                        (10)

Raeis Construction Services Ltd. Co., and their agent David Randin

 5747 Avonley Creek Dr. Sugar Hill, GA 30518 2000 Dairy Ashford, Houston TX. 77007 (Defendant)

                                                                        (11)

Porter International Construction, L.L.C. Vernon Smith CEO

20165 Old Houston Rd. Porter, Texas, 77365 (Co-Defendant)

                                                                        (12)

Russell Mills 9535 Tower Street Houston Texas, 77088, of All American Concrete and Construction (Co-Defendant)

                                                                        (13)

“United States of America” Not a Party to this U.S. Civil Suit

Thursday, June 18, 2015

June 15th 2015 "Bluejack National Golf Club" 4430 South Farm to Market 1486, Montgomery, Texas, 77316 "Texas Property Code Section 53.252", 53.052 and "Demand Letter"


Specifically, additionally “De Chavez Construction” namely Mr. Louis Charles Hamilton II, herein having legal possession, custody and control over a signed $120,000.00 agreed construction contract dated April 23rd 2015 to preformed concrete work at 797 Honea Egypt Road, Magnolia, TX for

Raeis Construction Services Ltd. Co. @ 5747 Avonley Creek Dr. Sugar Hill, GA 30518 (713) 657-0430 with office @ 2000 Dairy Ashford, Houston TX. Dairy Ashford Plaza #455, www.raeis.us

(713) 657-0430 (Houston) (770) 241-2756 with acting agent David Randin (832) 801-9377 signature and drafting the details of said construction contract… pictures and blueprint on file…

Specifically, Porter International Construction, L.L.C. CEO “Vernon Smith” committed as follows:

1.     Tortious Interference with existing contract between Mr. Louis Charles Hamilton II, and Raeis Construction Services Ltd. Co., over a signed $120,000.00 agreed contract dated April 23rd 2015 to preformed concrete work at 797 Honea Egypt Road, Magnolia, TX

2.     Tortious Interference with prospective relations, over a signed $120,000.00 agreed contract dated April 23rd 2015 to preformed concrete work at 797 Honea Egypt Road, Magnolia, TX

3.     Civil Conspirers with acting agent David Randin of Raeis Construction Services Ltd. Co. and Russell Mills 9535 Tower Street Houston Texas of “All American Concrete and Construction” to now have  “Vernon Smith” (CEO) of “Porter International Construction, L.L.C” 20165 Old Houston Rd. Porter, Texas, 77365 to performed said same $120,000.00 agreed contract dated April 23rd 2015 to preformed concrete work at 797 Honea Egypt Road, Magnolia, TX with pictures on file “Porter International Construction, L.L.C” physically performing said same $120,000.00 agreed contract dated April 23rd 2015

4.     Specifically, Porter International Construction, L.L.C. CEO “Vernon Smith” engage with acting agent David Randin of Raeis Construction Services Ltd. Co. and Russell Mills 9535 Tower Street Houston Texas of “All American Concrete and Construction” in a hostile assault and Defamation of “Louis Charles Hamilton II” stating of “Louis Charles Hamilton II” being substandard contractor to preformed any phase in concrete construction, at 797 Honea Egypt Road, Magnolia, TX and “worthless gutter street trash”.

5.     And this was done after Specifically, Porter International Construction, L.L.C. CEO “Vernon Smith” was on property @797 Honea Egypt Road, Magnolia, TX while “Louis Charles Hamilton II” already secured said $120,000.00 agreed contract dated April 23rd 2015,

6.     “However” agent David Randin of Raeis Construction Services Ltd. Co. and Russell Mills 9535 Tower Street Houston Texas of “All American Concrete and Construction” conspire together with Porter International Construction, L.L.C. CEO “Vernon Smith” in which Porter International Construction, L.L.C. CEO “Vernon Smith” now performed said on 797 Honea Egypt Road, Magnolia, TX while “Louis Charles Hamilton II” already having a secured concrete contract, blueprints for said $120,000.00 agreed contract signed by “Louis Charles Hamilton II, “David Randi” of “Raeis Construction Services Ltd. Co.” and Russell Mills 9535 Tower Street Houston Texas of “All American Concrete and Construction” dated April 23rd 2015, to the extent of several counts of Fraud, with Breach of Contract, Detrimental Reliance among other Federal Complaint cause of action being filed well within the statute of limitation deadline against.

7.      Specifically, Porter International Construction, L.L.C. CEO “Vernon Smith”, David Randin and  Raeis Construction Services Ltd. Co. and Russell Mills 9535 Tower Street Houston Texas of “All American Concrete and Construction”

8.     Specifically, Porter International Construction, L.L.C. CEO “Vernon Smith”, why do (me) “Vernon Smith” (CEO) of “Porter International Construction, L.L.C” 20165 Old Houston Rd. Porter, Texas, 77365 “recognized your Voice” ………  became clear after he asking question on the phone about the past about the 797 Honea Egypt Road, Magnolia, TX (Concrete Project) Which Specifically, Porter International Construction, L.L.C. CEO “Vernon Smith”, became happy engaged in his hostile “negro chicken thievery” approach to further cheat funds from “De Chavez Construction” for work now performed @ Blue jack National Golf Club 4430 South Farm to Market 1486, Montgomery, Texas, 77316 as fully described herein

9.      To include but not limited to Specifically, Porter International Construction, L.L.C. CEO “Vernon Smith”,  stated I fully know him (Now) in light of what is being described fully about the past 797 Honea Egypt Road, Magnolia, TX ($120,000.00) Concrete Project and Namely

10.            “Louis Charles Hamilton II, herein don’t want to mess with him or his son, (I) am weak and now I “De Chavez Construction” not entitled to nothing for Labor and Materials Provided to Real Property namely “Blue Jack National Golf Club” Located at 4430 South Farm to Market 1486, Montgomery, Texas, 77316

11.            Further (now) base on Specifically, Porter International Construction, L.L.C. CEO “Vernon Smith”, already obtain wrongfully said in the past the 797 Honea Egypt Road, Magnolia, TX ($120,000.00) Concrete Project with 5 other large “commercial concrete project’s after that to be done with Raeis Construction Services Ltd. Co.  Being plunder and Pilferage by “Porter International Construction, L.L.C.” CEO “Vernon Smith” and his (Son) Smith Jr.

12.            And now (I) “De Chavez Construction Co.” fully hostile am not entitled to nothing at all in both Concrete contracts namely @ Bluejack National Golf Club 4430 South Farm to Market 1486, Montgomery, Texas, 77316 to include but not limited to being not entitled to nothing in the past 797 Honea Egypt Road, Magnolia, TX ($120,000.00) Concrete Project with “Raeis Construction Services Ltd. Co.” @ 5747 Avonley Creek Dr. Sugar Hill, GA 30518 (713) 657-0430 with office @ 2000 Dairy Ashford, Houston TX. Dairy Ashford Plaza #455, www.raeis.us  (713) 657-0430 (Houston) (770) 241-2756 with acting agent David Randin (832) 801-9377 signature and drafting the final out line details of said construction contract… in his own hand written form, contract, pictures and “Commercial blueprints of 797 Honea Egypt Road, Magnolia, TX ($120,000.00) Concrete Project on file…

13.            As he (Now) on June 7th 2015 in the 8:30 am hour namely “Porter International Construction, L.L.C.” CEO “Vernon Smith”, and his (Son) Smith Jr. secured in  (Foolishly) feeling of having always the upper legal hand over “Louis Charles Hamilton II, a/ka/ Cmdr. Bluefin (United States Navy Secrete Ninja”  J

14.            Now with the extra Gang Member happy “Gun Man” foolish hostile attitude further directed against now “De Chavez Construction” namely said same Mr. Louis Charles Hamilton II, herein

In light of the physical facts that Specifically, Mr. Louis Charles Hamilton II, herein on June 9th 2015 at the 11:00 am hour throughout 9:00pm hour work on the Job, in cutting out the concrete roads but was misinformed, lie to, and used to performed excessive work as described largely due in fact and circumstances that Specifically, Porter International Construction, L.L.C. CEO Vernon Smith and Son “Smith Jr.”

Being 100% substandard, quite hostile with “De Chavez Construction Co.” over their own fault in their combine failure with all sub-contractors hired thereof performing the Concrete phase @ Bluejack National Golf Club 4430 South Farm to Market 1486, Montgomery, Texas, 77316

Specifically, 6000 feet of all concrete roads @ Bluejack National Golf Club approximately as showing in all the pictures (I) taken, posted on line, and personally examine by “Louis Charles Hamilton II” De Chavez Construction Co. and required to break out and fix the most outlandish areas of such substandard application in Concrete Construction

 Specifically, 6000 feet of all concrete roads @ Bluejack National Golf Club approximately as showing in all the pictures was never even graded, pack or compress, or sand beneath in a proper installment manner as required before any Concrete forming had commence

Specifically, 6000 feet of all concrete roads @ Bluejack National Golf Club approximately as showing in all the pictures has hidden  underground air pockets, and pot holes, now sealed in 8-10 inches of substandard concrete application to include

Specifically, 6000 feet of all concrete roads @ Bluejack National Golf Club approximately as showing in all the pictures posted, http://houston.craigslist.org/sks/5073027272.html was mostly pour in concrete excess of the required 7inches, (only)

 To include that Specifically, Porter International Construction, L.L.C.  Huge failure to grade these roads proper beforehand but (only) just did a quick Concrete construction which the roads are 20ft. wide in forming, on both sides of the roads and the Concrete Crew went for it

Regardless of the enormous waste in concrete @ 6000 feet of all concrete roads @ Bluejack National Golf Club in excess of the required 7 inches making a major financial wastes in this area alone in yards of concrete in excess of 800 yards of concrete at a cost of $110 per yard or $88,000.00

In excess of 7 inches lost in concrete excess as described in the original Construction blueprints @ Bluejack National Golf Club 4430 South Farm to Market 1486, Montgomery, Texas, 77316

Specifically, 6000 feet of all concrete roads @ Bluejack National Golf Club approximately as showing in all the pictures, was pour in concrete excess of 7 inches being done 8 to 8 ½ inches to in some underground hole pocket area in excess of  9-10 inches. Over a area in excess of 6000 feet of the original approved Construction blueprints @ Bluejack National Golf Club 4430 South Farm to Market 1486, Montgomery, Texas, 77316

To include that Specifically, Porter International Construction, L.L.C. Huge failure to proper float the concrete in among other areas at 7 sections with one entire road panel being required completely removed as described in the pictures and attached contract they boldly hire “De Chavez Construction Co”, Namely “Louis Charles Hamilton II” herein to fix their mess and substandard work.  

Yet “Porter International Construction, L.L.C.  CEO “Vernon Smith” falsely making hostile defamation claims against Namely “Louis Charles Hamilton II” in the past 797 Honea Egypt Road, Magnolia, TX ($120,000.00) Concrete Project with

“Raeis Construction Services Ltd. Co.” @ 5747 Avonley Creek Dr. Sugar Hill, GA 30518 (713) 657-0430 with office @ 2000 Dairy Ashford, Houston TX. Dairy Ashford Plaza #455, www.raeis.us  and Now “De Chavez Construction Co”, Namely “Louis Charles Hamilton II” herein files this Texas Property Code Section 53.252, and 53.052

And Notice of Unpaid Contract Balance Owed to Louis Charles Hamilton II, for Labor and Materials Provided to Real Property

“Blue jack National Golf Club” Located at 4430 South Farm to Market 1486, Montgomery, Texas, 77316 (Hereinafter the “Property” and Demand for Payment. And notice to “Porter International Construction, L.L.C.  CEO “Vernon Smith” for a further

Cause of Action for Breach of Construction Concrete Contract, Hostile working environment,

Theft of Services with knowingly intent to deprive thereof, by deception, force, threat or other unlawful means, and Negligent Misrepresentation in light of pending Federal Civil Cause of Actions against “Porter International Construction, L.L.C.  CEO “Vernon Smith” as described herein.

June 15th 2015 "Bluejack National Golf Club" 4430 South Farm to Market 1486, Montgomery, Texas, 77316 "Texas Property Code Section 53.252", 53.052 and "Demand Letter"

Specifically, Mr. Louis Charles Hamilton II, namely “De Chavez Construction” on June 9th 2015 at the 4:00pm hour with the ”The Saw Cutter” team, and with notice of some representative of the “General Contractor” (Tom), @ Bluejack National Golf Club 4430 South Farm to Market 1486, Montgomery, Texas, 77316
My Chief Crew, (Domingo), and labor (Spooky) all being qualified craftsmen and labors, reach a point and logical understanding that the 7 inch required depth was super unattainable and
Representative of the General Contractor (Tom) pointed after measuring our cut and seeing we reach well beyond 7 inches and still have not hit dirt as it is required by the “engineer staff” that the concrete road demolishing each 20x10 section at a count of 6 and one entire road panel must be completely saw off to the end and at full depth regardless if it well over 9 -10 and half inches in depth until we hit “dirt”…


“De Chavez Construction” Specifically, Mr. Louis Charles Hamilton II, herein at that precise second in time, waited till all discussions was reach, calculations and simply, referred the matter as follows,


 “Keep cutting” with the same “saw blade depth” at 7 and ½ plus already well beyond depth regardless of the agreed contract by Specifically,


Porter International Construction, L.L.C. for cutting such a task at hand, secondly per agreement, they “Porter International Construction, L.L.C.” just phone already me they will compensation and understanding we are continual working…


“De Chavez Construction” Specifically, Mr. Louis Charles Hamilton II, herein stated to General Contractor (Tom) @ Bluejack National Golf Club 4430 South Farm to Market 1486, Montgomery, Texas, 77316


We are sending a “driver” back to Houston Texas 1 plus our drive both ways, and get that big 12 plus inch “Cutting Blade” bring it back super fast and change the Concrete blade on the concrete saw and return to the first original cut, and start over, because then the saw should quicker as their already a major fault which representative of the General Contractor (Tom) @ Bluejack National Golf Club 4430 South Farm to Market 1486, Montgomery, Texas, 77316,


After hearing this became “very happy” and return to his big green nice clean truck… drove me and my crew down the road to another location around the bend about 800 yards away which required to be “saw cut” in addition and removed and replaced which was not under contract,


As well as the needed 300 ft. of “soft cutting” need to be also done straight down the middle to create a “control joint” as required per blueprints plans and after Specifically, Mr. Louis Charles Hamilton II, “De Chavez Construction” listen to


General Contractor (Tom) @ Bluejack National Golf Club 4430 South Farm to Market 1486, Montgomery, Texas, 77316 made his final plans be well known and Specifically, Mr. Louis Charles Hamilton II, namely “De Chavez Construction” agreed to all with General Contractor (Tom) @ Bluejack National Golf Club 4430 South Farm to Market 1486, Montgomery, Texas, 77316 which was also be known that (GC)


“General Contractor” was already withholding all monetary fund’s of “Porter International Construction, L.L.C.” in light of such a HUGE CONCRET mess as legally, correctly, and make no mistake about it a


 “New Sherlock Holmes” Cmdr. Bluefin” live Mystery Story with such elementary detailing, like “Doctor Watson” never foreseen before all quite eyebrow raising true…!


General Contractor (Tom) @ Bluejack National Golf Club 4430 South Farm to Market 1486, Montgomery, Texas, 77316 at this point in time simply departed while as we were all being watch by his staff throughout the 9:20pm hour at the task at hand until escorted off the property…


Specifically, Mr. Louis Charles Hamilton II, namely “De Chavez Construction” on June 9th 2015, reach an agreement with Porter International Construction, L.L.C. as follows:


1.     $5500.00 for the labor only, and Porter International Construction, L.L.C. will provide their big “Backhoe” for the breaking out of the old cut out concrete and for hauling away from the main road, over to a area where other concrete tear out had been haul too.


2.     “Porter International Construction, L.L.C” will deposited $2000.00 same day, supply all concrete, “However” at the start of the Job, Porter International Construction, L.L.C only came up with $500.00 cash, and agreed after we left property we will get, $1500.00 same day


3.      However, “Smith Jr.” of “Porter International Construction, L.L.C” refused to pay, and stated he will kick ass before he ever pay for work we just done, and telling (me) and (Doming) that the concrete is at the required 7 inches depth and we are confused, and don’t know what we are talking about and not entitled to be compensated, and at this point


4.     Porter International Construction, L.L.C (Smith Jr.) hand over blueprint to a foundation job, for a “New Home” at the location of “Sydnor Street” and “Gillespie Street” in Houston Texas and wanting “De Chavez Construction” on June 10th 2015, to commence also to finished this project (asap) on June 10th 2015 which was formed but needing to be poured and finished as this was underway also and need super fast attention of “De Chavez Construction” (Copy of New Plans of “Porter International Construction, L.L.C”  on file herein)b


5.     To include but not limited to Porter International Construction, L.L.C  trying to scam “De Chavez Construction” to doing 20x10 (200) extra sq. ft. of concrete demolition work and replacement that he “Porter International Construction, L.L.C”  left out of the contract and claim it was covered under same contract and wanting this done also under the same contract, in the 1:00 am hour


6.     While refusal to even pay the agreed $1500.00 same day deposit at which after this time a fight almost started with “Smith Jr.” and (Domingo), but “Smith Jr.” after doing a lot of “Big Extra Big Size Man Barking” because of his large size Man Frame and Body Weight realized that little (Domingo), fixing to tear him off a “funky meat hook ugly phase” even if he is a little small (Mexican) J to which I stop the “next phase” from being very, very (Omg) real ugly, and stated simply, we want our money, you “Porter International Construction, L.L.C “ a. talk work, we work, b. Porter International Construction, L.L.C  you talk money, we are here now to be paid, and you want more work with these plans c. you (now)Porter International Construction, L.L.C  talking big man fight, he (Domingo)ready to fight, what is your Porter International Construction, L.L.C  problem…?


7.     Porter International Construction, L.L.C “Smith Jr.” now agreed to give “De Chavez Construction” in the 1:00 am hour after all that “physically happen” throughout the day and “no supper being had” while stuck out @ Bluejack National Golf Club 4430 South Farm to Market 1486, Montgomery, Texas, 77316 nothing in sight but “dark trees” as described in paragraph (2) above


8.     Porter International Construction, L.L.C “Smith Jr.” will come to the job sight with now $2000.00 cash and “De Chavez Construction” will continue to return to work in the 8:00 am hour and finished the contract, the extra $500 was to cover our extra work in cutting and tear out of concrete and he will pay extra also for 300 ft. of soft cutting as this being needed too.


9.     “However” in the morning hour “Vernon Smith” namely  CEO of “Porter International Construction, L.L.C” phone Specifically, Mr. Louis Charles Hamilton II, namely wishing to speak with he assumed the actual physical “De Chavez Construction” being as he assumed that (I) am (Mexican) on June 10th 2015, stating a different kind of hostile story, that “Porter International Construction, L.L.C” will not be paying $500 that was to cover our extra work as required for the extra cutting and tear out due to “Porter International Construction, L.L.C” on fault


10.             And “De Chavez Construction” will only get $1000.00 deposit after being on the job site and need to return to work asap, and nothing else will be paid out until “De Chavez Construction” meet all final inspections of “Porter International Construction, L.L.C”


11.             To include but not limited to “De Chavez Construction” get nothing if  on June 10th 2015 “De Chavez Construction” and his crew do not return to work and break out all of that “substandard concrete that’s been highlighted in orange paint… next phase is ready for form up and set conditions for ready to be pour concrete road @ Bluejack National Golf Club 4430 South Farm to Market 1486, Montgomery, Texas, 77316 in two days and why is “De Chavez Construction” and staff bullying his son “Smith Jr.” of “Porter International Construction, L.L.C” 


12.            And as further boldly stated: why do (me) “Vernon Smith” (CEO) of “Porter International Construction, L.L.C” 20165 Old Houston Rd. Porter, Texas, 77365 “recognized your Voice” ………  “De Chavez Construction” ……………….(OK) “Hold the phone “Batman”  J

Cmdr. Bluefin “Sherlock Holmes” Case of “The lost Golden Golf Club” on the “18th hole”…


Specifically, Mr. Louis Charles Hamilton II, namely “De Chavez Construction” on June 9th 2015 at the 4:00pm hour with the ”The Saw Cutter” team, and with notice of some representative of the “General Contractor” (Tom), @ Bluejack National Golf Club 4430 South Farm to Market 1486, Montgomery, Texas, 77316

My Chief Crew, (Domingo), and labor (Spooky) all being qualified craftsmen and labors, reach a point and logical understanding that the 7 inch required depth was super unattainable and
Representative of the General Contractor (Tom) pointed after measuring our cut and seeing we reach well beyond 7 inches and still have not hit dirt as it is required by the “engineer staff” that the concrete road demolishing each 20x10 section at a count of 6 and one entire road panel must be completely saw off to the end and at full depth regardless if it well over 9 -10 and half inches in depth until we hit “dirt”…

“De Chavez Construction” Specifically, Mr. Louis Charles Hamilton II, herein at that precise second in time, waited till all discussions was reach, calculations and simply, referred the matter as follows,

 “Keep cutting” with the same “saw blade depth” at 7 and ½ plus already well beyond depth regardless of the agreed contract by Specifically,

Porter International Construction, L.L.C. for cutting such a task at hand, secondly per agreement, they “Porter International Construction, L.L.C.” just phone already me they will compensation and understanding we are continual working…

“De Chavez Construction” Specifically, Mr. Louis Charles Hamilton II, herein stated to General Contractor (Tom) @ Bluejack National Golf Club 4430 South Farm to Market 1486, Montgomery, Texas, 77316

We are sending a “driver” back to Houston Texas 1 plus our drive both ways, and get that big 12 plus inch “Cutting Blade” bring it back super fast and change the Concrete blade on the concrete saw and return to the first original cut, and start over, because then the saw should quicker as their already a major fault which representative of the General Contractor (Tom) @ Bluejack National Golf Club 4430 South Farm to Market 1486, Montgomery, Texas, 77316,

After hearing this became “very happy” and return to his big green nice clean truck… drove me and my crew down the road to another location around the bend about 800 yards away which required to be “saw cut” in addition and removed and replaced which was not under contract,

As well as the needed 300 ft. of “soft cutting” need to be also done straight down the middle to create a “control joint” as required per blueprints plans and after Specifically, Mr. Louis Charles Hamilton II, “De Chavez Construction” listen to

General Contractor (Tom) @ Bluejack National Golf Club 4430 South Farm to Market 1486, Montgomery, Texas, 77316 made his final plans be well known and Specifically, Mr. Louis Charles Hamilton II, namely “De Chavez Construction” agreed to all with General Contractor (Tom) @ Bluejack National Golf Club 4430 South Farm to Market 1486, Montgomery, Texas, 77316 which was also be known that (GC)

“General Contractor” was already withholding all monetary fund’s of “Porter International Construction, L.L.C.” in light of such a HUGE CONCRET mess as legally, correctly, and make no mistake about it a

 “New Sherlock Holmes” Cmdr. Bluefin” live Mystery Story with such elementary detailing, like “Doctor Watson” never foreseen before all quite eyebrow raising true…!

General Contractor (Tom) @ Bluejack National Golf Club 4430 South Farm to Market 1486, Montgomery, Texas, 77316 at this point in time simply departed while as we were all being watch by his staff throughout the 9:20pm hour at the task at hand until escorted off the property…

Specifically, Mr. Louis Charles Hamilton II, namely “De Chavez Construction” on June 9th 2015, reach an agreement with Porter International Construction, L.L.C. as follows:

1.     $5500.00 for the labor only, and Porter International Construction, L.L.C. will provide their big “Backhoe” for the breaking out of the old cut out concrete and for hauling away from the main road, over to a area where other concrete tear out had been haul too.

2.     “Porter International Construction, L.L.C” will deposited $2000.00 same day, supply all concrete, “However” at the start of the Job, Porter International Construction, L.L.C only came up with $500.00 cash, and agreed after we left property we will get, $1500.00 same day

3.      However, “Smith Jr.” of “Porter International Construction, L.L.C” refused to pay, and stated he will kick ass before he ever pay for work we just done, and telling (me) and (Doming) that the concrete is at the required 7 inches depth and we are confused, and don’t know what we are talking about and not entitled to be compensated, and at this point

4.     Porter International Construction, L.L.C (Smith Jr.) hand over blueprint to a foundation job, for a “New Home” at the location of “Sydnor Street” and “Gillespie Street” in Houston Texas and wanting “De Chavez Construction” on June 10th 2015, to commence also to finished this project (asap) on June 10th 2015 which was formed but needing to be poured and finished as this was underway also and need super fast attention of “De Chavez Construction” (Copy of New Plans of “Porter International Construction, L.L.C”  on file herein)b

5.     To include but not limited to Porter International Construction, L.L.C  trying to scam “De Chavez Construction” to doing 20x10 (200) extra sq. ft. of concrete demolition work and replacement that he “Porter International Construction, L.L.C”  left out of the contract and claim it was covered under same contract and wanting this done also under the same contract, in the 1:00 am hour

6.     While refusal to even pay the agreed $1500.00 same day deposit at which after this time a fight almost started with “Smith Jr.” and (Domingo), but “Smith Jr.” after doing a lot of “Big Extra Big Size Man Barking” because of his large size Man Frame and Body Weight realized that little (Domingo), fixing to tear him off a “funky meat hook ugly phase” even if he is a little small (Mexican) J to which I stop the “next phase” from being very, very (Omg) real ugly, and stated simply, we want our money, you “Porter International Construction, L.L.C “ a. talk work, we work, b. Porter International Construction, L.L.C  you talk money, we are here now to be paid, and you want more work with these plans c. you (now)Porter International Construction, L.L.C  talking big man fight, he (Domingo)ready to fight, what is your Porter International Construction, L.L.C  problem…?

7.     Porter International Construction, L.L.C “Smith Jr.” now agreed to give “De Chavez Construction” in the 1:00 am hour after all that “physically happen” throughout the day and “no supper being had” while stuck out @ Bluejack National Golf Club 4430 South Farm to Market 1486, Montgomery, Texas, 77316 nothing in sight but “dark trees” as described in paragraph (2) above

8.     Porter International Construction, L.L.C “Smith Jr.” will come to the job sight with now $2000.00 cash and “De Chavez Construction” will continue to return to work in the 8:00 am hour and finished the contract, the extra $500 was to cover our extra work in cutting and tear out of concrete and he will pay extra also for 300 ft. of soft cutting as this being needed too.

9.     “However” in the morning hour “Vernon Smith” namely  CEO of “Porter International Construction, L.L.C” phone Specifically, Mr. Louis Charles Hamilton II, namely wishing to speak with he assumed the actual physical “De Chavez Construction” being as he assumed that (I) am (Mexican) on June 10th 2015, stating a different kind of hostile story, that “Porter International Construction, L.L.C” will not be paying $500 that was to cover our extra work as required for the extra cutting and tear out due to “Porter International Construction, L.L.C” on fault

10.             And “De Chavez Construction” will only get $1000.00 deposit after being on the job site and need to return to work asap, and nothing else will be paid out until “De Chavez Construction” meet all final inspections of “Porter International Construction, L.L.C”

11.             To include but not limited to “De Chavez Construction” get nothing if  on June 10th 2015 “De Chavez Construction” and his crew do not return to work and break out all of that “substandard concrete that’s been highlighted in orange paint… next phase is ready for form up and set conditions for ready to be pour concrete road @ Bluejack National Golf Club 4430 South Farm to Market 1486, Montgomery, Texas, 77316 in two days and why is “De Chavez Construction” and staff bullying his son “Smith Jr.” of “Porter International Construction, L.L.C” 

12.            And as further boldly stated: why do (me) “Vernon Smith” (CEO) of “Porter International Construction, L.L.C” 20165 Old Houston Rd. Porter, Texas, 77365 “recognized your Voice” ………  “De Chavez Construction” ……………….(OK) “Hold the phone “Batman”  J

To all readers except “Commander in Chief (Obama) being If your extra slow, watch this next “Cmdr. Bluefin” United States Ninja Navy classy legal chess move  J  to be continue… Louis Charles Hamilton II

Cmdr. Bluefin “Sherlock Holmes” Case of “The lost Golden Golf Club” on the “18th hole”…

FYI: De Chavez Construction is name for my “Sweet” Philippine Born (Baby) “Pinky Rose De Chavez” J (I) am a Negro…