Specifically, Mr. Louis Charles Hamilton II, on June 9th
2015 was retained by Porter International Construction, L.L.C. 20165 Old
Houston Rd. Porter, Texas, 77365 And
their agent Lavern Smith Jr. cell # 832-229-8960
*see attached photo of his passport* as executed in the
agreed contract attached copy filed herein.
Specifically, Mr. Louis Charles
Hamilton II, Company “De Chavez Construction Co.” was retained by Porter
International Construction, L.L.C. Lavern
Smith Jr. for to execute (6) section of
20x20 from center of expansion Joint 5 foot each side thereof 20x30 saw cut, at
7inces depth, break out & pour back with
4000psi concrete with
a light broom finish, with rebar # 4 set and one entire road panel completely removed
as required to comply with construction blueprint plans for Bluejack National
Golf Club @ 4430 South Farm to Market 1486, Montgomery, Texas, 77316
Specifically, Mr. Louis Charles
Hamilton II, on June 9th 2015 at the 11:00 am hour throughout 9:00pm
hour work on the Job, in cutting out the concrete roads but was misinformed,
lie to, and used to performed excessive work as described largely due in fact
and circumstances that Specifically, Porter International Construction, L.L.C.
Being 100% substandard, quite hostile with De Chavez Construction
over their own fault in their combine failure with all sub-contractors hired thereof
performing the Concrete phase @ Bluejack National Golf Club 4430 South Farm to
Market 1486, Montgomery, Texas, 77316
Specifically, 6000 feet of all concrete roads @ Bluejack
National Golf Club approximately as showing in all the pictures (I) taken, posted
on line, and personally examine by “Louis Charles Hamilton II” De Chavez
Construction Co. and required to break out and fix the most outlandish areas of
such substandard application in Concrete Construction
Specifically, 6000
feet of all concrete roads @ Bluejack National Golf Club approximately as
showing in all the pictures was never even graded, pack or compress, or sand
beneath in a proper installment manner as required before any Concrete forming had
commence
Specifically, 6000 feet of all concrete roads @ Bluejack
National Golf Club approximately as showing in all the pictures has hidden underground air pockets, and pot holes, now
sealed in 8-10 inches of substandard concrete application to include
Specifically, 6000 feet of all concrete roads @ Bluejack
National Golf Club approximately as showing in all the pictures posted, http://houston.craigslist.org/sks/5073027272.html
was mostly pour in concrete excess of the required 7inches, (only)
To include that Specifically,
Porter International Construction, L.L.C. Huge failure to grade these roads proper beforehand
but (only) just did a quick Concrete construction which the roads are 20ft.
wide in forming, on both sides of the roads and the Concrete Crew went for it
Regardless of the enormous waste in concrete @ 6000 feet of all
concrete roads @ Bluejack National Golf Club in excess of the required 7 inches
making a major financial wastes in this area alone in yards of concrete in
excess of 800 yards of concrete at a cost of $110 per yard or $88,000.00
In excess of 7 inches lost in concrete excess as described in
the original Construction blueprints @ Bluejack National Golf Club 4430 South
Farm to Market 1486, Montgomery, Texas, 77316
Specifically, 6000 feet of all concrete roads @ Bluejack
National Golf Club approximately as showing in all the pictures, was pour in
concrete excess of 7 inches being done 8 to 8 ½ inches to in some underground hole
pocket area in excess of 9-10 inches. Over
a area in excess of 6000 feet of the original approved Construction blueprints @
Bluejack National Golf Club 4430 South Farm to Market 1486, Montgomery, Texas,
77316
To include that Specifically, Porter International
Construction, L.L.C. Huge failure to
proper float the concrete in 7 sections with one entire road panel being
required completely removed as described in the pictures and attached contract
they boldly hire “De Chavez Construction Co, Namely “Louis Charles Hamilton II”
herein.
:Note the enormous waste in concrete @ 6000 feet of all concrete
roads @ Bluejack National Golf Club as described in the pictures of “De Chavez
Construction in excess of the required 7 inches making a major financial wastes
in yards of concrete in excess of 800 yards of concrete waited at a cost of approximately
$110 per yard or $88,000.00 lost in concrete excess do not
reflect or computed for concrete losses in the rest of the 755 acres roads of
rolling hills and beautifully wooded countryside, @ Bluejack National Golf Club
4430 South Farm to Market 1486, Montgomery, Texas, 77316
Being concrete
constructed, formed, graded, compress, and cement poured by Specifically, Porter
International Construction, L.L.C.
No comments:
Post a Comment