56.
“We Thee Abused (American) “Negro Race”…
Appearance Respectfully
before his/her “World Honorable Presiding “Justices”,
“Affirm”, “State”, and “declare” legally, furtherance’s herein
“Proclaim” this undersigned
Notary Seal Date in the Year of 2015 of the Lord
We ever (Negro) race from 1619-2099
A 2013 study
by the “National Renewable Energy Laboratory”
Concluded
that the average large photovoltaic plant in the United States occupied 3.1
acres of permanently disturbed area and 3.4 acres of total site area per
gigawatt-hour per year.
The average
CSP plant in the US occupied 2.7 acres of disturbed area and 3.5 acres of total
area per GWh/yr
A 2015
life-cycle analysis of land use for various sources of electricity concluded
that concentrating solar power had a land-use footprint of 9.0 m2/MWhr for
trough, and 14 m2/MWhr for power tower.
57.
The
concentrating solar footprint was smaller than that of coal power (18 m2/MWhr),
but larger than the other sources studied, including ground photovoltaic (7.9
m2/MWhr), natural gas (0.49 m2/MWhr), and wind power (0.26 m2/MWhr).
When
considering land use impacts associated with the exploration and extraction
through to transportation and conversion of fossile fuel which are used for
most of our electrical power,
Utility-scale
solar power compares as one of the most land-efficient energy resources
available,
The federal
government has dedicated nearly 2,000 times more acreage to oil and gas leases
than to solar development.
In 2010 the Bureau
of Land Management approved nine large-scale solar projects,
With a total generating capacity of 3,682
megawatts, representing approximately 40,000 acres. In contrast, in 2010,
58.
The Bureau
of Land Management processed more than 5,200 applications gas and oil leases,
And issued
1,308 leases, for a total of 3.2 million acres.
Currently, 38.2 million acres of onshore
public lands and an additional 36.9 million acres of offshore exploration in
the
Gulf of
Mexico are under lease for oil and gas development, exploration and production
The 392 MW Ivanpah Solar Power Facility, located 40 miles
(64 km) southwest of Las Vegas, is the world's largest solar-thermal power
plant project which became fully operational on February 13, 2014
59.
“We Thee Abused (American) “Negro Race”…
Appearance Respectfully
before his/her “World Honorable Presiding “Justices”,
“Affirm”, “State”, and “declare” legally, furtherance’s herein
“Proclaim” this very undersigned “Notary
Seal Date” in the Year of 2015 of the Lord
We ever (Negro) race from 1619-2099 being past frozen in participating engage in, join in, get
involved in, share in,
Play a part/role in, be a participant in, partake in, have a
hand in, be associated with
“White Only” (American)
prosperity while this
Abundance of
“solar energy” makes solar power plants a cleaner alternative to traditional
power plants,
Which burn
fossil fuels” such as “oil” and Coal”, just sitting about unharnessed”
The “Secret White
Society” of the Deep dark ages Defendant “United States of America”, and their
2015-2016 election
“Front Man”,
proposal for “Immigration reform”
Continual embarrassing
in objective direct at “People” of color, namely Hispanic and Mexicans”
Of all
illegal Immigrants residing in “United States” having sought refugee, in
(America) for a better way of Prosperity as claim by
Defendant
“White Only” Constitution of America,
The
Hispanic, Mexican having been a building back bone to America forever, and
needing no further abused by the “Secrete Control White Society”
Along a “Hostile”
but practical building a “Boarder Wall” along the “United States of America” Southern
border, which estimated a proclaim cost in (Billions),
Which the
U.S. Border with Mexico”, is roughly, 2000 miles long and underlines four
(American) states from “California to Texas” which is a massive stretch of land,
As the “Berlin
Wall” spanned just 96 miles comparatively, and it cost about $25 Million to
build in 1961, or around $200 Million with inflation”,
United
States of America herein poison the very own (Negro) abused race “drinking
water, “Pursuant to “Dred Scott” Vs. Sandford, 60 U.S. 393 (1857),
And Thee almighty “Secret
White Control Slave institution” having been letting their infrastructures collapsed
and decay, in prosperity for just “White Only”,
While “Solar Energy Generating
Systems (SEGS) is the name given to nine “Solar power plants” in the “Mojave
Dessert”, which were built in the 1980s, the first commercial solar plant
These plants have a combined
capacity of 354 “megawatts” (MW) which them the largest “Solar power” installation in the “World”, until “Ivanpah Solar
Power Facility was finished in 2014
“Nevada Solar One is a Solar thermal plant
with a 64 MW generating capacity, located near “Boulder City, Nevada.
The “Copper Mountain Solar Facility is a 150 MW photovoltaic power plant in Boulder City, Nevada,
The “Ivanpah Solar Power Facility” is a 370 MW facility which consists of three separate solar thermal power plants just off interstate highway 15 on the Nevada-California border in the Mojave Desert.
There are also plans to build other large solar plants in the Mojave Desert,
60.
“We Thee Abused (American) “Negro Race”…
Appearance Respectfully
before his/her “World Honorable Presiding “Justices”,
“Affirm”, “State”, and “declare” legally, furtherance’s herein
“Proclaim” as this very undersigned
Notary Seal Date being official in the Year of 2015 of the Lord
We ever (Negro) race from 1619-2099 being past frozen in participating,
new 2016-2099 “Freedmen's Bureau”,
Shall as of this undersigned date fully “patent”, and making official new 2016-2099 “Freedmen's Bureau”, construction business
Claims, design, being secure from “official Plagiarism” from the always criminal acts
of prosperity for “White Only” society
As this New (American) Project is belong 100,000 And 1000% the official
property project of
We Thee (Abused) Negro Race residing in America” and officially building
what just sitting
about fully neglected and “unharnessed”,
“Solar Energy”
being claim by the official new 2016-2099 “Freedmen's Bureau”, construction business
The full entire distance required of the U.S. Border with Mexico”, is roughly, 2000 miles long and
3,987 miles long of “Northern”
Boarder Walls
between
“United
States of America” and “Canada”, of
“Pure Clean Sound
Miles of Free Solar Energy” of sound constructed efficient, organized, skilful,
labor saving,
Productive (American)
“Boarder Walls” of solar thermal power, and accompany power transfer power plants,
All being
100% “logical” and “orderly designed businesslike”
In (America) new 2016-2099 “Freedmen's Bureau”,
Power Plant protected
and practical free energy for future in a simple “Boarder Walls”, design of a
well-organized and competent way to build a protected boarder wall other this
lame,
Secret Pursuant
to “Dred Scott” Vs. Sandford, 60 U.S. 393 (1857),
“White Only” prosperity society of slow thinking
“America” design in “dirty concrete” full of useless International “Gang graffiti”.
As this “Project”
of We thee Abused (Negro) race of America 2015-2099 is officially being
New Energy and
untapped presented before The Honorable “World Court of
Justice” The Hague and not the
“Chattel
Property interest”, of the Deep Dark Ages Defendant “United States of America” officially
herein.
No comments:
Post a Comment