Friday, November 20, 2015

Louis Charles Hamilton II (USN) 2015 “We Thee Abused (American) “Negro Race”… “World Court of Justice” The Hague (Petition)


                                                       56.

“We Thee Abused (American) “Negro Race”… Appearance Respectfully before his/her “World Honorable Presiding “Justices”,

“Affirm”, “State”, and “declare” legally, furtherance’s herein

“Proclaim” this undersigned Notary Seal Date in the Year of 2015 of the Lord

We ever (Negro) race from 1619-2099

A 2013 study by the “National Renewable Energy Laboratory”

Concluded that the average large photovoltaic plant in the United States occupied 3.1 acres of permanently disturbed area and 3.4 acres of total site area per gigawatt-hour per year.

The average CSP plant in the US occupied 2.7 acres of disturbed area and 3.5 acres of total area per GWh/yr

A 2015 life-cycle analysis of land use for various sources of electricity concluded that concentrating solar power had a land-use footprint of 9.0 m2/MWhr for trough, and 14 m2/MWhr for power tower.

                                                      57.

The concentrating solar footprint was smaller than that of coal power (18 m2/MWhr), but larger than the other sources studied, including ground photovoltaic (7.9 m2/MWhr), natural gas (0.49 m2/MWhr), and wind power (0.26 m2/MWhr).

When considering land use impacts associated with the exploration and extraction through to transportation and conversion of fossile fuel which are used for most of our electrical power,

Utility-scale solar power compares as one of the most land-efficient energy resources available,

The federal government has dedicated nearly 2,000 times more acreage to oil and gas leases than to solar development.

In 2010 the Bureau of Land Management approved nine large-scale solar projects,

 With a total generating capacity of 3,682 megawatts, representing approximately 40,000 acres. In contrast, in 2010,

                                                            58.

The Bureau of Land Management processed more than 5,200 applications gas and oil leases,

And issued 1,308 leases, for a total of 3.2 million acres.

 Currently, 38.2 million acres of onshore public lands and an additional 36.9 million acres of offshore exploration in the

Gulf of Mexico are under lease for oil and gas development, exploration and production

The 392 MW Ivanpah Solar Power Facility, located 40 miles (64 km) southwest of Las Vegas, is the world's largest solar-thermal power plant project which became fully operational on February 13, 2014

                                                            59.

“We Thee Abused (American) “Negro Race”… Appearance Respectfully before his/her “World Honorable Presiding “Justices”,

“Affirm”, “State”, and “declare” legally, furtherance’s herein

“Proclaim” this very undersigned “Notary Seal Date” in the Year of 2015 of the Lord

We ever (Negro) race from 1619-2099 being past frozen in participating engage in, join in, get involved in, share in,

Play a part/role in, be a participant in, partake in, have a hand in, be associated with

 “White Only” (American) prosperity while this

Abundance of “solar energy” makes solar power plants a cleaner alternative to traditional power plants,

Which burn fossil fuels” such as “oil” and Coal”, just sitting about unharnessed”

The “Secret White Society” of the Deep dark ages Defendant “United States of America”, and their 2015-2016 election

“Front Man”, proposal for “Immigration reform”

Continual embarrassing in objective direct at “People” of color, namely Hispanic and Mexicans”

Of all illegal Immigrants residing in “United States” having sought refugee, in (America) for a better way of Prosperity as claim by

Defendant “White Only” Constitution of America,

The Hispanic, Mexican having been a building back bone to America forever, and needing no further abused by the “Secrete Control White Society”

Along a “Hostile” but practical building a “Boarder Wall” along the “United States of America” Southern border, which estimated a proclaim cost in (Billions),

Which the U.S. Border with Mexico”, is roughly, 2000 miles long and underlines four (American) states from “California to Texas” which is a massive stretch of land,

As the “Berlin Wall” spanned just 96 miles comparatively, and it cost about $25 Million to build in 1961, or around $200 Million with inflation”,

United States of America herein poison the very own (Negro) abused race “drinking water, “Pursuant to “Dred Scott” Vs. Sandford, 60 U.S. 393 (1857),

And Thee almighty “Secret White Control Slave institution” having been letting their infrastructures collapsed and decay, in prosperity for just “White Only”,

While “Solar Energy Generating Systems (SEGS) is the name given to nine “Solar power plants” in the “Mojave Dessert”, which were built in the 1980s, the first commercial solar plant

These plants have a combined capacity of 354 “megawatts” (MW) which them the largest “Solar power” installation in the “World”, until “Ivanpah Solar Power Facility was finished in 2014

 “Nevada Solar One is a Solar thermal plant with a 64 MW generating capacity, located near “Boulder City, Nevada.

The “Copper Mountain Solar Facility is a 150 MW photovoltaic power plant in Boulder City, Nevada,

            The “Ivanpah Solar Power Facility” is a 370 MW facility which consists of three separate solar thermal power plants just off interstate highway 15 on the Nevada-California border in the Mojave Desert.

There are also plans to build other large solar plants in the Mojave Desert,

                                                                 60.

 “We Thee Abused (American) “Negro Race”… Appearance Respectfully before his/her “World Honorable Presiding “Justices”,

“Affirm”, “State”, and “declare” legally, furtherance’s herein

“Proclaim” as this very undersigned Notary Seal Date being official in the Year of 2015 of the Lord

We ever (Negro) race from 1619-2099 being past frozen in participating, new 2016-2099 Freedmen's Bureau,

Shall as of this undersigned date fully “patent”, and making official new 2016-2099 Freedmen's Bureau, construction business

Claims, design, being secure from “official Plagiarism” from the always criminal acts of prosperity for “White Only” society

As this New (American) Project is belong 100,000 And 1000% the official property project of

We Thee (Abused) Negro Race residing in America” and officially building what just sitting about fully neglected and “unharnessed”,

“Solar Energy” being claim by the official new 2016-2099 “Freedmen's Bureau”, construction business

The full entire distance required of the U.S. Border with Mexico”, is roughly, 2000 miles long and

3,987 miles long of “Northern” Boarder Walls between

“United States of America” and “Canada”, of

“Pure Clean Sound Miles of Free Solar Energy” of sound constructed efficient, organized, skilful, labor saving,

Productive (American) “Boarder Walls” of solar thermal power, and accompany power transfer power plants,

All being 100% “logical” and “orderly designed businesslike”

 In (America) new 2016-2099 Freedmen's Bureau,

Power Plant protected and practical free energy for future in a simple “Boarder Walls”, design of a well-organized and competent way to build a protected boarder wall other this lame,

Secret Pursuant to “Dred Scott” Vs. Sandford, 60 U.S. 393 (1857),

 “White Only” prosperity society of slow thinking “America” design in “dirty concrete” full of useless International “Gang graffiti”.

As this “Project” of We thee Abused (Negro) race of America 2015-2099 is officially being

New Energy and untapped presented before The Honorable “World Court of Justice” The Hague and not the

“Chattel Property interest”, of the Deep Dark Ages Defendant “United States of America” officially herein.

 

No comments:

Post a Comment